114 results for “washington park”
CRE N Illinois

Kinzie Industrial Corridor flex space sells for $3.9 million

Interra Realty announced the $3.9 million sale of 1827 W. Hubbard Street, a 33,000-square-foot flex office building in Chicago’s West Town neighborhood, within the boundaries of the Kinzie Industrial Corridor. Interra director Colin O’Malley and co-founding principal Jon Morgan represented the private seller. The buyer was Chicago-based Day…

Multifamily X Missouri

Knoebel wraps construction of new loft building in Missouri

Knoebel Construction has completed construction on the $3 million historic renovation of the former Langenberg Hat Building in Washington, Missouri, at 330 W. Front St. As general contractor, Knoebel Construction converted the two-story brick building into a multi-use space featuring six two-bedroom lofts and Streetside Tacos, a sit-down re…

Multifamily N Illinois

Wicker Park Connection adds retail users, hits the market

Two retail tenants, Philz Coffee and [solidcore], have signed leases at Wicker Park Connection, the mixed-use project co-developed by Hubbard Street Group and Centrum Realty and Development. Located just west of the intersection of Division Street and Ashland Avenue on Chicago’s Northwest Side, the new leases should attract buyers as the de…

CRE N Illinois

The Cook County Land Bank looks to go commercial

| Matt Baker

With numerous vacant properties left at the tide line of the receding Great Recession, The Cook County Land Bank Authority (CCLBA) was created in 2013 to find new uses for this inventory. Though their early efforts focused on single-family homes, the rehabilitation of industrial and commercial properties is poised to make an even larger impact.

Industrial N Illinois

Data center headed to Chicago's South Side in adaptive reuse

CIM Group and fifteenfortyseven Critical Systems Realty (“1547”) have acquired Midway Technology Centre, an approximately 220,000-square-foot, vacant industrial campus consisting of a five-story building and surface parking lots. The property is expected to be converted into a 26 MW, Tier III+ data center with tech office space designed to …