Meridian awarded self storage project in Wheaton

May 13, 2013  |  Staff Writer  |  Print Article  |  Email this Article

Meridian Design Build was recently selected to act as general contractor for an 81,543-square-foot self-storage facility in Wheaton for The Lock Up. The new four-story facility will be located adjacent to the Main Street Marketplace shopping center at the northwest corner of Main Street and Geneva Road.

The building will offer climate controlled and drive-up units and will feature covered loading bays with secure access to accommodate the needs of its clients. The project is Meridian’s second for The Lock Up, with construction currently underway on a 73,000-square-foot four-story facility in Bonita Springs, Fla.

Peter Stadler, senior vice president, and David Lukas, associate project manager, are coordinating the project for Meridian. Architectural services are being provided by Partners in Design Architects and civil engineering work is being completed by Watermark Engineering Resources Ltd.

Tags | , , , , ,

© 2014 Real Estate Communications Group. Duplication or reproduction of this article not permitted without authorization from the Real Estate Publishing Group. For information on reprint or electronic pdf of this article contact Mark Menzies at 312-644-4610 or menzies@rejournals.com

Leave a Reply